The owners installed a 3.6 t (4-ton) geothermal heating and cooling system. The system serves to heat, cool and de-humidify the home. It also preheats the hot water for the home.
The owners of this home are pleased with their system, and are projecting they will recover their costs in less than 11 years.
The system is a horizontal, closed-loop system that requires about 600 m (2000′) of underground pipes placed in about 150 m (500′) of trenching.
The system was installed in 5 days by ROSS Refrigeration Ltd.
The owners suggest that people exploring geothermal should pay close attention to all aspects of installation and research extensively before beginning.
The owners plan to install a net metered wind turbine to help offset the electrical needs of the geothermal system.






